| Sign In | Join Free | My portofva.com |
|
| Brand Name: DELLOK | Certification: CE. ISO,EN10204. 3.1 Cert. |
| Model Number: Low Finned Tubes | Minimum Order Quantity: N/A Contact us for details |
| Delivery Time: Ex-work with 5 weeks after order. | Payment Terms: L/C, T/T Contact us for details |
| Dellok Yonghui Radiating Pipe Manufacturing Co.,Ltd. [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: Reliance | Certification: CE,ISO... |
| Model Number: LF | Minimum Order Quantity: N/A |
| Delivery Time: Ex-work with 5 weeks after order. | Payment Terms: T/T, L/C |
| JIANGSU RELIANCE THERMAL EQUIPMENT CO., LTD [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: YUHONG SPECIAL STEEL | Certification: ABS, GL, DNV, NK, PED, AD2000, GOST9941-81, CCS, ISO 9001-2008 |
| Model Number: Stainless Steel Corrugated Fin Tube | Minimum Order Quantity: 1PC |
| Delivery Time: 10days-> | Payment Terms: T/T, L/C |
| Yuhong Group Co.,Ltd [Zhejiang,China] | |
| Verified Supplier | |
| Brand Name: Yuhong | Certification: ABS, BV, DNV, CCS, LR |
| Model Number: Serrated Finned tube | Minimum Order Quantity: 1PC |
| Delivery Time: Depends on the quantity | Payment Terms: TT, LC |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Verified Supplier | |
| Brand Name: Yuhong | Certification: DNV, BV, PED, LR, ABS, TS, CCS |
| Model Number: TP304,TP316L | Minimum Order Quantity: 1 pc |
| Delivery Time: 7-45DAYS | Payment Terms: L/C, T/T |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Active Member | |
| Brand Name: YUHONG | Certification: ABS, DNV-GL, LR, BV, CCS, KR, ASME, TUV, SGS, BV, IEI, IBR, ISO9001, ISO 14001, ISO 18001 |
| Model Number: Low Fin Tube | Minimum Order Quantity: 1 PC |
| Delivery Time: 5 - 90 Days | Place of Origin: China , Korea |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Verified Supplier | |
| Brand Name: SAT-CHAM | Certification: ISO CE |
| Model Number: Boiler H-fin tube | Minimum Order Quantity: 1 Set |
| Delivery Time: 30 Days | Payment Terms: L/C, T/T, Western Union |
| Jiangsu Sat-Cham Energy Technology Co., Ltd. [China] | |
| Verified Supplier | |
| Brand Name: Torich | Certification: ISO9001 TS16949 |
| Model Number: Low Fin Tube | Minimum Order Quantity: 200pcs |
| Delivery Time: 5-8 week days | Payment Terms: L/C, T/T |
| Torich International Limited [Zhejiang,China] | |
| Site Member | |
| Brand Name: TORICH | Certification: ISO 9001,ISO14001,TS16949 |
| Model Number: GB/T19447 C10200 | Minimum Order Quantity: 500 KGS |
| Delivery Time: 20-45 DAYS | Payment Terms: T/T, L/C, D/A, D/P, Western Union, MoneyGram |
| TORICH INTERNATIONAL LIMITED [Zhejiang,China] | |
| Verified Supplier | |
| Brand Name: HZFT | Certification: ISO9001:2008 |
| Model Number: L-19015.222147-00 | Minimum Order Quantity: 1 Pcs |
| Delivery Time: 1 - 30 Days | Payment Terms: L/C , T/T |
| Hangzhou Fin Tube Co., Ltd. [Zhejiang,China] | |
| Verified Supplier | |
| Brand Name: TISCO | Certification: ASTM,AISI,JIS,SUS,DIN,EN |
| Model Number: 439 1.4510 | Minimum Order Quantity: 2 tons |
| Delivery Time: 15 work days | Payment Terms: L/C, T/T |
| TSING SHAN STEEL INDUSTRIAL LIMITED [Jiangsu] | |
| Verified Supplier | |
| Brand Name: HD BOILER | Certification: ISO9001 , SGS , TUV , ASME , EN |
| Model Number: Boiler Fin Tube | Minimum Order Quantity: 1 set |
| Delivery Time: 30 - 60 Days | Payment Terms: Western Union |
| Zhangjiagang HuaDong Boiler Co., Ltd. [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: HDT | Certification: ISO9001,ASME,Grade A,SGS,EN,TUV |
| Model Number: Boiler Fin Tube | Minimum Order Quantity: 5T |
| Delivery Time: 60-75days | Payment Terms: L/C, T/T, Western Union |
| ZHANGJIAGANG HUA DONG ENERGY TECHNOLOGY CO.,LTD [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: TOBO | Certification: SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED |
| Model Number: A/SA668/213 TP316L | Minimum Order Quantity: 1 pcs |
| Delivery Time: 15- 20 work days | Payment Terms: L/C, T/T, Western Union |
| TOBO STEEL GROUP CHINA [Shanghai,China] | |
| Verified Supplier | |
| Brand Name: GNEE | Certification: ISO 9001 |
| Model Number: Finned Tube | Minimum Order Quantity: 1 ton |
| Delivery Time: 5-8 work days | Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Gnee Steel (tianjin) Co., Ltd. [Henan,China] | |
| Verified Supplier | |
| Brand Name: Dehai Boiler | Certification: ISO9001 , SGS , ABS , ASME |
| Model Number: Fin tube | Minimum Order Quantity: 1 Set |
| Delivery Time: 30 Days | Payment Terms: L/C, T/T |
| Zhangjiagang Dehai Boiler Co., Ltd [China] | |
| Verified Supplier | |
| Brand Name: YUHONG | Certification: ISO 9001/TUV/PED |
| Model Number: Alloy Steel Fin Tube HFW Serrated Type | Minimum Order Quantity: 1PC |
| Delivery Time: Depends on order quantity | Payment Terms: T/T,L/C AT SIGHT |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Verified Supplier | |
| Brand Name: SANCO | Certification: ISO9001 , ASME, TUV,EN |
| Model Number: Boiler Fin Tube | Minimum Order Quantity: 1Set |
| Delivery Time: 30 | Payment Terms: L/C, T/T, Western Union |
| SuZhou Saneco boiler co.ltd [Jiangsu,China] | |
| Verified Supplier | |
| Certification: BSI | Minimum Order Quantity: negotiable |
| Place of Origin: Zhejiang, China (Mainland) | Price: negotiable |
| Standard: ASTM | Grade: 10#, 20#, 45# |
| TORICH INTERNATIONAL LIMITED [Zhejiang,China] | |
| Verified Supplier | |