TORICH is an enterprise that has been producing precision steel pipes and steel pipe processing for over 20 years, with a factory area of approximately 20000 square meters
Sign In | Join Free | My portofva.com |
|
Categories | Heat Exchanger Steel Tube |
---|---|
Place of Origin: | Zhejiang, China (Mainland) |
Certification: | ISO 9001 ISO14001 TS16949 |
Price: | negotiable |
Standard: | ASTM, SA192 |
Grade Group: | A53-A369 |
Thickness: | 2.2 - 25.4 mm |
Section Shape: | Round |
Outer Diameter(Round): | 12.7 - 177.8 mm |
Application: | Boiler Pipe |
Technique: | Cold Drawn |
Surface Treatment: | oil |
Product name: | sa 192 boiler seamless pipe Carbon steel boiler pipes |
Keywords: | seamless boiler tube |
Shape: | Round Shape |
Length: | 3-22m |
MOQ: | negotiable |
Company Info. |
TORICH INTERNATIONAL LIMITED |
Verified Supplier |
View Contact Details |
Product List |
seamless boiler steel tube
sa 192 boiler seamless pipe Carbon steel boiler pipes
Applications:
for Boilers,Superheaters,
Heat-Exchangers,
High-pressure Boilers,
Steam Boilers
Cold Condensers and High-Pressure Services,
High-Temperature Services for Boiler Constructions
Manufacture:Tubes are manufactured by seamless process and both hot finished
and cold finished are applicable.
seamless boiler steel tube
sa 192 boiler seamless pipe Carbon steel boiler pipes
seamless boiler tube
Heat treatment:Hot finished tubes need not be heat treated.Cold Finished tubes are heat treated after the final cold finishing
pass at a temperature of 1200℉(650℃) or higher
Steel grade SA192 Chemical Composition & Mechanical properties
C | Mn | P | S | Si | Tensile Strength | Yeild point | Elongation |
0.06-0.18 | 0.27-0.63 | 0.035Max | 0.035Max | 0.25Max | min ksi[Mpa] 47[325] | min ksi[Mpa] 26[180] | ≥35% |
Hardness
Brinell Hardness | Rockwell Hardness Number |
WT≥0.200in(5.1mm) | WT<0.200in(5.1mm) |
137HRB | 77HRB |
sa 192 boiler seamless pipe Carbon steel boiler pipes
1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring
Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield
Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample of sa 192 boiler seamless pipe Carbon steel boiler pipes for free charge but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30%
T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
![]() |