TORICH is an enterprise that has been producing precision steel pipes and steel pipe processing for over 20 years, with a factory area of approximately 20000 square meters
Sign In | Join Free | My portofva.com |
|
Categories | Heat Exchanger Steel Tube |
---|---|
Place of Origin: | Zhejiang, China (Mainland) |
Certification: | ISO 9001 ISO14001 TS16949 |
Price: | negotiable |
MOQ: | negotiable |
Standard: | ASTM, SA192 |
Standard2: | ASTM A179-1990 |
Grade Group: | A53-A369 |
Grade: | A192 |
Thickness: | 2.2 - 25.4 mm |
Section Shape: | Round |
Outer Diameter(Round): | 12.7 - 177.8 mm |
Secondary Or Not: | Non-secondary |
Application: | Boiler Pipe |
Technique: | Cold Drawn |
Surface Treatment: | oil |
Special Pipe: | boiler tubes |
Alloy Or Not: | Non-alloy |
Product name: | Seamless high pressure boiler tube Sa192 sa179 |
Keywords: | high pressure boiler tube |
Material: | SA192 |
Length: | 3-22M |
MTC: | En10204.3.2B |
Company Info. |
TORICH INTERNATIONAL LIMITED |
Verified Supplier |
View Contact Details |
Product List |
seamless boiler steel tube
Seamless high pressure boiler tube Sa192 sa179
Applications:
for Boilers,Superheaters,
Heat-Exchangers,
High-pressure Boilers,
Steam Boilers
Cold Condensers and High-Pressure Services,
High-Temperature Services for Boiler Constructions
Manufacture:Tubes are manufactured by seamless process and both hot finished
and cold finished are applicable.
Seamless high pressure boiler tube Sa192 sa179
high pressure boiler tube
Heat treatment:Hot finished tubes need not be heat treated.Cold Finished tubes are heat treated after the final cold finishing
pass at a temperature of 1200℉(650℃) or higher
Steel grade SA192 Chemical Composition & Mechanical properties
C | Mn | P | S | Si | Tensile Strength | Yeild point | Elongation |
0.06-0.18 | 0.27-0.63 | 0.035Max | 0.035Max | 0.25Max | min ksi[Mpa] 47[325] | min ksi[Mpa] 26[180] | ≥35% |
Hardness
Brinell Hardness | Rockwell Hardness Number |
WT≥0.200in(5.1mm) | WT<0.200in(5.1mm) |
137HRB | 77HRB |
Seamless high pressure boiler tube Sa192 sa179
1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring
Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield
Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample of Seamless high pressure boiler tube Sa192 sa179 for free charge but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30%
T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
![]() |