| Sign In | Join Free | My portofva.com |
|
| Brand Name: HDB | Minimum Order Quantity: 1 Set |
| Delivery Time: 30~50 days | Packaging Details: Sea worthy Packing for Export |
| Product Name: Spiral Finned Tube | Application: Boiler Economizer, Air Preahter |
| Zhangjiagang HuaDong Boiler Co., Ltd. [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: TOBO | Certification: ISO SGS |
| Model Number: Stainless Steel | Minimum Order Quantity: 1PC |
| Delivery Time: 15 DAYS | Payment Terms: T/T |
| TOBO STEEL GROUP CHINA [Shanghai,China] | |
| Verified Supplier | |
| Brand Name: YUHONG | Certification: ABS, GL, DNV, NK, PED, AD2000, GOST9941-81, CCS, ISO 9001-2008 |
| Model Number: ASTM A312 TP304H & 304 | Minimum Order Quantity: 100 KGS |
| Delivery Time: 20-80 days | Payment Terms: T/T, L/C |
| Yuhong Group Co.,Ltd [Zhejiang,China] | |
| Verified Supplier | |
| Brand Name: Torich | Certification: ISO 9001 |
| Model Number: Fin tubes | Minimum Order Quantity: 5 tons |
| Delivery Time: 60-100days | Payment Terms: L/C, T/T |
| Torich International Limited [Zhejiang,China] | |
| Site Member | |
| Brand Name: HDT | Certification: ASME, TUV, SGS, ABS, PED, ISO9001, Grade A |
| Model Number: HDT-ST002 | Minimum Order Quantity: 5T |
| Delivery Time: 60-75days after getting the down payment or L/C | Payment Terms: L/C, T/T, Western Union |
| ZHANGJIAGANG HUA DONG ENERGY TECHNOLOGY CO.,LTD [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: Hengye | Certification: CE,ISO |
| Model Number: customized | Minimum Order Quantity: 1 Piece/Pieces |
| Place of Origin: Jiangsu, China (Mainland) | Supply Ability: 3000 Piece/Pieces per Week |
| Wuxi Hengye Electric Heater Equipment Co., Ltd [Jiangsu,China] | |
| Active Member | |
| Brand Name: Yuhong | Certification: ABS, BV, DNV, CCS, LR |
| Model Number: ASME SA192 Serrated Finned Tube | Minimum Order Quantity: 100 KGS |
| Delivery Time: 20-80 days | Payment Terms: TT, LC |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Verified Supplier | |
| Brand Name: YUHONG | Certification: ABS, GL, DNV, NK, PED, AD2000, GOST9941-81, CCS, ISO 9001-2008 |
| Model Number: ASME SA192 Serrated Finned Tube | Minimum Order Quantity: 100 KGS |
| Delivery Time: 20-80 days | Payment Terms: T/T,L/C |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Active Member | |
| Brand Name: Hwalon | Certification: RoSH, CE |
| Model Number: PTC Ceramic Air Heater | Minimum Order Quantity: Negotiation |
| Delivery Time: 10-20 days | Payment Terms: T/T, Western Union,PayPal |
| Shenzhen Hwalon Electronic Co., Ltd. [Guangdong,China] | |
| Verified Supplier | |
| Brand Name: GME | Certification: CE |
| Minimum Order Quantity: 50pcs | Delivery Time: 7~10 working days |
| Payment Terms: T/T, Western Union, MoneyGram, L/C | Place of Origin: China |
| Wuhan Global Metal Engineering Co., Ltd [Hubei,China] | |
| Verified Supplier | |
| Brand Name: YUHONG | Certification: ASME, PED, API , ABS, LR, DNV, GL , BV, KR, TS, CCS |
| Model Number: High Frequency weld fin tube, Welding fin tube, Fin Tube, Finned Tube, Solid Fin tube, HFW fin tube | Minimum Order Quantity: 1PC |
| Delivery Time: 5---75 days | Payment Terms: L/C,T/T |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Verified Supplier | |
| Brand Name: DELLOK Yonghui | Certification: ISO9001 |
| Model Number: Low Fin Tube | Minimum Order Quantity: 1 meter |
| Delivery Time: 1-3 weeks | Payment Terms: T/T, L/C, D/A, D/P, Western Union, MoneyGram |
| Dellok Yonghui Radiating Pipe Manufacturing Co.,Ltd. [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: Reliance | Certification: CE,ISO... |
| Model Number: HFW | Minimum Order Quantity: N/A |
| Delivery Time: Ex-work within 1 month on recepit of order. | Payment Terms: T/T, L/C |
| JIANGSU RELIANCE THERMAL EQUIPMENT CO., LTD [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: HZFT | Certification: ISO9001:2008 |
| Model Number: L-19015.222147-00 | Minimum Order Quantity: 1 Pcs |
| Delivery Time: 1 - 30 Days | Payment Terms: L/C , T/T |
| Hangzhou Fin Tube Co., Ltd. [Zhejiang,China] | |
| Verified Supplier | |
| Brand Name: GNEE | Certification: ISO 9001 |
| Model Number: Finned Tube | Minimum Order Quantity: 1 ton |
| Delivery Time: 5-8 work days | Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Gnee Steel (tianjin) Co., Ltd. [Henan,China] | |
| Verified Supplier | |
| Brand Name: SAT-CHAM | Certification: ISO CE |
| Model Number: Boiler H-fin tube | Minimum Order Quantity: 1 Set |
| Delivery Time: 30 Days | Payment Terms: L/C, T/T, Western Union |
| Jiangsu Sat-Cham Energy Technology Co., Ltd. [China] | |
| Verified Supplier | |
| Brand Name: YUHONG | Certification: ISO 9001/TUV/PED |
| Model Number: ASME SA106 Gr.B -HFW | Minimum Order Quantity: 500KGS |
| Delivery Time: Depends on order quantity | Payment Terms: T/T, L/C AT SIGHT |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Verified Supplier | |
| Brand Name: TOBO | Model Number: U Fin Tube |
| Minimum Order Quantity: 1pcs | Delivery Time: 15-25 workdays |
| Payment Terms: L/C, D/A, T/T, Western Union | Place of Origin: China |
| TOBO STEEL GROUP CHINA [Shanghai,China] | |
| Verified Supplier | |