| Sign In | Join Free | My portofva.com |
|
| Brand Name: Yuhong | Certification: ABS, BV, DNV, CCS, LR |
| Model Number: ASTM B111 C71500 Low Finned Tube | Minimum Order Quantity: 2 PCS |
| Delivery Time: 50-60 Days (Depend on Customer's Requirements) | Payment Terms: TT, LC |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Verified Supplier | |
| Brand Name: Reliance | Certification: CE,ISO... |
| Model Number: LF | Minimum Order Quantity: N/A |
| Delivery Time: Normally Ex-work with 1 month after order. | Payment Terms: T/T, L/C |
| JIANGSU RELIANCE THERMAL EQUIPMENT CO., LTD [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: YUHONG | Certification: ABS, GL, DNV, NK, PED, AD2000, GOST9941-81, CCS, ISO 9001-2015 |
| Model Number: ASTM B111 C71500 | Minimum Order Quantity: Depend the size of finned tubes, 50-100PC |
| Delivery Time: 35-60 days | Payment Terms: L/C,T/T |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Verified Supplier | |
| Brand Name: DELLOK Yonghui | Certification: CE. ISO,EN10204. 3.1 Cert. |
| Model Number: Reliance | Minimum Order Quantity: 1 meter |
| Delivery Time: Ex-work with 1 month after order. | Payment Terms: L/C, T/T Contact us for details, L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Dellok Yonghui Radiating Pipe Manufacturing Co.,Ltd. [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: YUHONG | Certification: ABS, DNV-GL, LR, BV, CCS, KR, ASME, TUV, SGS, BV, IEI, IBR, ISO9001, ISO 14001, ISO 18001 |
| Model Number: Low Fin Tube | Minimum Order Quantity: 1 PC |
| Delivery Time: 5 - 90 Days | Place of Origin: China , Korea |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Active Member | |
| Brand Name: YUHONG | Certification: ABS, GL, DNV, NK, PED, AD2000, CCS, ISO 9001-2008 |
| Model Number: C70600 - O61 | Minimum Order Quantity: 50PC |
| Delivery Time: 30-80 days | Payment Terms: T/T, L/C |
| Yuhong Group Co.,Ltd [Zhejiang,China] | |
| Verified Supplier | |
| Brand Name: SAT-CHAM | Certification: ISO CE |
| Model Number: Boiler H-fin tube | Minimum Order Quantity: 1 Set |
| Delivery Time: 30 Days | Payment Terms: L/C, T/T, Western Union |
| Jiangsu Sat-Cham Energy Technology Co., Ltd. [China] | |
| Verified Supplier | |
| Brand Name: Torich | Certification: ISO9001 TS16949 |
| Model Number: Low Fin Tube | Minimum Order Quantity: 200pcs |
| Delivery Time: 5-8 week days | Payment Terms: L/C, T/T |
| Torich International Limited [Zhejiang,China] | |
| Site Member | |
| Brand Name: TORICH | Certification: ISO 9001,ISO14001,TS16949 |
| Model Number: GB/T19447 C10200 | Minimum Order Quantity: 500 KGS |
| Delivery Time: 20-45 DAYS | Payment Terms: T/T, L/C, D/A, D/P, Western Union, MoneyGram |
| TORICH INTERNATIONAL LIMITED [Zhejiang,China] | |
| Verified Supplier | |
| Brand Name: HZFT | Certification: ISO9001:2008 |
| Model Number: L-19015.222147-00 | Minimum Order Quantity: 1 Pcs |
| Delivery Time: 1 - 30 Days | Payment Terms: L/C , T/T |
| Hangzhou Fin Tube Co., Ltd. [Zhejiang,China] | |
| Verified Supplier | |
| Brand Name: TISCO | Certification: ASTM,AISI,JIS,SUS,DIN,EN |
| Model Number: 439 1.4510 | Minimum Order Quantity: 2 tons |
| Delivery Time: 15 work days | Payment Terms: L/C, T/T |
| TSING SHAN STEEL INDUSTRIAL LIMITED [Jiangsu] | |
| Verified Supplier | |
| Brand Name: GNEE | Certification: ISO 9001 |
| Model Number: Finned Tube | Minimum Order Quantity: 1 ton |
| Delivery Time: 5-8 work days | Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Gnee Steel (tianjin) Co., Ltd. [Henan,China] | |
| Verified Supplier | |
| Brand Name: HD Boiler | Certification: ASME, ISO9001:2015, ISOEN3834 |
| Model Number: H / Spiral TYPE | Minimum Order Quantity: 3 TONS |
| Delivery Time: Depands on Qty | Payment Terms: 30% after contract and balance 70% before shipment, or 100% L/C at sight |
| Zhangjiagang HuaDong Boiler Co., Ltd. [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: HDT | Certification: ISO9001,ASME,Grade A,SGS,EN,TUV |
| Model Number: Boiler Fin Tube | Minimum Order Quantity: 5T |
| Delivery Time: 60-75days | Payment Terms: L/C, T/T, Western Union |
| ZHANGJIAGANG HUA DONG ENERGY TECHNOLOGY CO.,LTD [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: Joyruns | Certification: ISO9001 |
| Model Number: 6mm to 88.9mm | Minimum Order Quantity: 2Tons |
| Delivery Time: 20days | Payment Terms: L/C, T/T |
| Changzhou Joyruns Steel Tube CO.,LTD [China] | |
| Verified Supplier | |
| Brand Name: Dehai Boiler | Certification: ISO9001 , SGS , ABS , ASME |
| Model Number: Fin tube | Minimum Order Quantity: 1 Set |
| Delivery Time: 30 Days | Payment Terms: L/C, T/T |
| Zhangjiagang Dehai Boiler Co., Ltd [China] | |
| Verified Supplier | |
| Brand Name: YUHONG | Certification: ISO 9001/TUV/PED |
| Model Number: Alloy Steel Fin Tube HFW Serrated Type | Minimum Order Quantity: 1PC |
| Delivery Time: Depends on order quantity | Payment Terms: T/T, L/C AT SIGHT |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Verified Supplier | |
| Brand Name: Metal | Certification: CE |
| Model Number: P1 | Minimum Order Quantity: 1 |
| Delivery Time: 7 | Payment Terms: T/T |
| TOBO STEEL GROUP CHINA [Shanghai,China] | |
| Verified Supplier | |
| Brand Name: TOBO | Certification: SGS |
| Model Number: TOBO-44 | Minimum Order Quantity: 1PCS |
| Delivery Time: 7-15 WORK DAYS | Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| TOBO STEEL GROUP CHINA [Shanghai,China] | |
| Verified Supplier | |