Sign In | Join Free | My portofva.com |
|
Categories | Egg Processing Machine |
---|---|
Condition: | New |
Applicable Industries: | Hotels, Garment Shops, Building Material Shops, Machinery Repair Shops, Manufacturing Plant, Food & Beverage Factory, Farms, Restaurant, Home Use, Retail, Food Shop, Printing Shops, Construction works , Energy & Mining, Food & Beverage Shops, Advertising C |
Weight (KG): | 45 |
Showroom Location: | None |
Video outgoing-inspection: | Provided |
Machinery Test Report: | Provided |
Warranty of core components: | 1 Year |
Core Components: | Motor, Gear |
Place of Origin: | China |
Type: | Egg processing equipment, Steel ball egg washing machine |
Warranty: | 1 Year |
Application fields: | Vegetable processing plant, Meat processing plants, Commercial catering, Snack food factory, Beverage Factory, Flour mill, Seasoning plant, Bakery, Fruit processing plant, Cooking oil factory, Frozen food Factory |
Machinery Capacity: | 2000pcs/h |
Machinery Function: | Cleaning egg equipment |
Product name: | Automatic Duck Egg Cleaning Machine |
Function: | chicken duck,bird washing Egg processing equipment |
Advantage: | Double row egg trough |
Application: | egg cleaner for farm,kitchen,restaurant,bakery |
MOQ: | 1 Set |
output: | 2000pcs/h |
Weight: | 45kg |
Size: | 120*38*50cm |
Packing: | Wooden Case |
Packaging Details: | Our machine will be packaged in plastic film inside then packaged in fumigation-free plywood case. |
Port: | shanghai/qingdao/tianjin/shenzhen |
Supply Ability: | 100 Set/Sets per Month |
Price: | $300.00 - $800.00/sets |
Company Info. |
Henan Huafood Machinery Technology Co.,Ltd. |
Verified Supplier |
View Contact Details |
Product List |
Model | HFD-E-1500 |
Suitable object | Eggs and duck eggs are common, goose eggs need to be made into a
separate mold |
Deaning efficiency | 1500-1700 pieces/hour |
Rated voltage | 220v |
Rated power | 750W |
Dimensions | 1.2m width 50cm height 60cm |
Weight | 120*50*60cm |
Delivery Way | Delivery Time |
By air | About10-20 days days after leaving the port |
By sea | About20-30 days days after leaving the port |
![]() |