Categories | Excavator Vibro Hammer |
---|---|
Brand Name: | OEM |
Place of Origin: | CHINA |
MOQ: | 1pcs |
Price: | Negotiation |
Payment Terms: | T/T, L/C, Western Union |
Supply Ability: | 10000PCS |
Delivery Time: | 15 working days |
Packaging Details: | Standard package |
Name: | Excavator Mounted Vibro Hammer |
welding: | auto machine |
max digging depth: | 25m |
processing: | advanced equipment |
quality: | very reliable |
matirial: | Q550 |
Company Info. |
Guangzhou Jinweixin Excavator Parts Co., Ltd. |
Verified Supplier |
View Contact Details |
Product List |
Q550 Excavator Vibro Hammer 25m Digging Depth With Lubricating System
Q550 Matirial Excavator Vibro Hammer Easy Install With Lubricating System
Features:
1. Standard supply include: bucket, linkage, bucket cylinder, 4oil pipe/hose, 6pins, lubricating system
2. Conform to Europe Machinery Directive 2006/42/EC Article 12 . We have CE certificate.
3. Many different material such as Q345B,Q690D,Weldox are optional to suit to your application.
4. Big boom can be split into two sections to be loadable by container.
5. All steel plate edge are tapered by bevelling machine before welding , which will enhance welding greatly.
6. Some parts can be consolidated using thicker plate or overlapping another plate for heavy-duty application such as mining operation.
7. Applicable for all the make and model of excavator.
8. Extra pipeline can be put on for extra attachments such as breaker, hammer, quick coupler and so
Common Models:
Model | LDB120 | LDB200 | LDB220 | LDB300 | LDB350 | LDB400 | LDB450 |
Total length (mm) | 13000 | 15380 | 15380 | 18000 | 20000 | 22000 | 24000 |
Weight (kg) | 3000 | 4000 | 4200 | 5200 | 6000 | 6500 | 7000 |
Max dig depth (mm) | 9000 | 11340 | 11370 | 13000 | 15000 | 16500 | 18000 |
Max extensive Scope (mm) | 12500 | 15100 | 15100 | 17600 | 19600 | 21600 | 23600 |
Max dig height (mm) | 11300 | 12510 | 12610 | 13720 | 14920 | 16100 | 17300 |
Folding height (mm) | 2900 | 2980 | 3040 | 3210 | 3210 | 3400 | 3400 |
Bucket volume (m3) | 0.3 | 0.4 | 0.4 | 0.4 | 0.5 | 0.6 | 0.6 |
Excavator Tonnage(ton) | 12 | 20 | 22 | 30 | 35 | 40 | 45 |
Packing and shipping:
1. We pack it by film at first, then secure it inside the container by fixing to the container wall through steel wire.
2. One container can load 3 complete sets(we use rack to hold the upper sets).
3. Production leadtime is 15 days for 1 set, 20 days for 3 sets
Friendly Links: www.everychina.com
Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Contact Us |Help |关于我们 |联系我们